tunnellingjournal
tunnellingjournal
Written by
tom watts on
25/07/2016 in
Tagged:
More Like This
Rapid progress reported on Vishnugad-Pipalkoti Hydropower Project
TERRATEC has announced that the Ø9.86m Hard Rock Double Shield TBM being driven by Hindustan Construction Co. Ltd – primary…
CREG Slurry TBM Ready for Chongtai Yangtze River Tunnel
January 27th 2024 saw the 15.4m diameter Slurry TBM “CREC 1398”, designed and manufactured by China Railway Engineering Equipment Group…
Snowy 2.0 reports cavern crown breakthrough
Snowy Hydro has announced another major achievement for the Snowy 2.0 pumped-hydro project in New South Wales, with the breakthrough…
Comments: