Bruce
Bruce
Written by
tom watts on
24/05/2013 in
Tagged:
More Like This
Final breakthrough achieved on London Power Tunnels
National Grid’s US$1.2bn London Power Tunnels (LPT) project has achieved a major milestone with its final tunnelling breakthrough at Eltham…
HS2 digital concrete test to cut carbon
A successful trial of a ground-breaking digital measuring system for concrete has led to a roll-out across multiple sites on…
First TBM breaks through at Broadway’s Oak-VGH Station
The first of two 6m diameter Herrenknecht TBMs has broken through at the future Oak-VGH Station, achieving another milestone for Vancouver’s…
Comments: