49053 tbm elizabeth lowered into main shaft 25 october 2012
49053 tbm elizabeth lowered into main shaft 25 october 2012
Written by
tom watts on
26/10/2012 in
Tagged:
More Like This
Mont Cenis’ Herrenknecht gripper TBM unveiled
A new TBM that will excavate 18km of one of the twin tubes on the Lyon-Turin railway line has been…
CREG announces TBM Online Monitoring and Diagnosis System (TOMD)
China Railway Engineering Equipment Group Co., Ltd. (CREG) has announced the research and development of the TBM Component Conditions Online…
Delhi Metro EPBM FAT celebrated
Representatives of the Delhi Metro Rail Corporation Limited, project contractor J.Kumar Infraprojects Ltd, and TBM supplier TERRATEC have celebrated the…
Comments: