S52 170807 PK 31
S52 170807 PK 31
Written by
tom watts on
27/09/2017 in
Tagged:
More Like This
CREG Slurry TBM Ready for Chongtai Yangtze River Tunnel
January 27th 2024 saw the 15.4m diameter Slurry TBM “CREC 1398”, designed and manufactured by China Railway Engineering Equipment Group…
Abstract deadline for 9th International Symposium on Sprayed Concrete
The deadline for submission of abstracts for the 9th International Symposium on Sprayed Concrete – to be held at Scandic…
HS2’s Euston logistics tunnel breakthrough
HS2 has celebrated the breakthrough of a TBM into its underground Old Oak Common station – marking a key milestone…
Comments: