A Robbins 6.25m diameter Main Beam TBM began boring India’s 8.3km Mumbai Water Tunnel this June, and had bored over…
Day: 11 July 2012
Singapore DTL 3 tunnelling begins
Tunnelling works for the third and final stage of the Singapore LTA’s Downtown Line (DTL3) officially start today at the…