Seattle Tunnel Partners (STP), Washington State Department of Transportation’s (WSDOT) design-build contractor for the SR-99 (Alaskan Way Viaduct Replacement) Tunnel…
Day: 16 December 2013
Black River double shield launches in Ohio
Near the banks of the Black River, a 7m (23ft) diameter Robbins Double Shield TBM and continuous conveyor system are…
Evergreen gears up for launch
The first elements of the 9.84m (32.3ft) diameter Caterpillar mixed face EPBM, which will be used to excavate the 2km…