California’s Bay Area Rapid Transit (BART) is aiming to start construction on a second tube under the San Francisco Bay…
Day: 29 November 2018
Preferred bidder selected for Central Interceptor Tunnel
Auckland’s Watercare has selected Ghella-Abergeldie Harker Joint Venture as its preferred bidder for the construction of the 13km long, 4.5m diameter…