Using sprayed concrete with a bonded waterproofing membrane could bring huge environmental benefits in hard rock tunnels. So why is no one doing it? Kristina Smith reports.
Day: 10 September 2020
First Milan M4 central section TBM breaks through
The first of two Herrenknecht 9.15m diameter TBMs involved in the construction of Milan’s M4 metro line central section has…