Using sprayed concrete with a bonded waterproofing membrane could bring huge environmental benefits in hard rock tunnels. So why is no one doing it? Kristina Smith reports.
Day: September 10, 2020
First Milan M4 central section TBM breaks through
The first of two Herrenknecht 9.15m diameter TBMs involved in the construction of Milan’s M4 metro line central section has…