On 18th February 2025 the TBM being used to construct the pressure tunnel on the VERBUND project ‘Kaprun 2029’ started…
Day: 19 February 2025
First Chinese-made TBM Exported to the Solomon Islands
On February 17th, TBM “Shuangjing No.1” with an excavation diameter of 4.48m left the production line at the second industrial…