Bertha Side piece lift and place 1
Bertha Side piece lift and place 1
Written by
tom watts on
24/03/2015 in
Tagged:
More Like This
TWRP Pipeline-C1 Tunnel breaks through in Singapore
November 22nd saw Shanghai Tunnel Engineering Co (Singapore) breakthrough successfully on the S$116M contract price TWRP Pipeline-C1 Tunnel in Singapore….
HS2’s next Northolt Tunnel TBMs head underground
Major components of the first of the second pair of Herrenknecht EPBMs that will bore HS2’s 13.4km long Northolt High…
ITA Tunnelling Awards 2023 winners announced
The winners of the 9TH Edition of the ITA TUNNELLING AWARDS were announced in Mumbai, India on 24th November in conjunction with…
Comments: