tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2022
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > BMB officially awarded Tideway West

BMB officially awarded Tideway West

Tris Thomas

Written by Tris Thomas on 24/08/2015 in News

Tagged:

The Balfour Beatty/Morgan Sindall/BAM Nuttall JV has been officially awarded a £416M contract to construct part of London’s new ‘super sewer’, the Thames Tideway Tunnel, for Bazalgette Tunnel Limited.

The Thames Tideway Tunnel will ensure the capital’s sewerage system is fit to support its projected population for at least the next 100 years, and will tackle the issue of discharges of untreated sewage that currently enter the River Thames on a regular basis.

The three-way equal joint venture, which is known as BMB and  was appointed as preferred bidder for the scheme in February 2015, will create the 6km ‘West’ section of the 25km Thames Tideway Tunnel.

BMB’s ‘West’ section will run from Acton in West London to Wandsworth in South West London and will incorporate seven separate work sites along the route. Works will include design, construction, commissioning and maintenance for a two to five year period following construction completion.

A digital construction approach utilising Building Information Modelling (BIM) will allow full testing and simulation of construction activity before works start on site for safe and efficient delivery. Project materials will be transported down the River Thames to ease road congestion, emissions and disruption throughout the duration of the project.

TMobilisation work for the ‘West’ tunnel will begin in September this year with completion scheduled for 2022.   The Thames Tideway Tunnel project will create more than 9,000 direct and indirect jobs at the peak of construction.

Leo Quinn, Balfour Beatty Group Chief Executive said:  “Balfour Beatty’s expert teams have for many years helped to make the London landscape – both visible and invisible – what it is today, ensuring it can to continue to grow as one of the world’s leading capital cities. The award of this unique infrastructure project, which is part of the largest ever undertaken by the UK water industry, is another example of the part we are playing in 21st Century engineering.

“At the same time, together with our joint venture partners, we are committed to delivering tangible benefits for our local communities and their economy – through sensitive construction, engaging local businesses and SMEs into our supply chain and providing local job opportunities, including 50 new apprenticeships.”

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

27/11/2022

Broadway Subway Project set for second TBM launch

Broadway Subway Project set for second TBM launch

Work on the $1.728bn Broadway Subway project has reached another milestone with the Broadway Subway Project Corporation, an Acciona-Ghella joint venture,…

22/11/2022

CREG TBM breaks through on phosphate mine inclined shaft

CREG TBM breaks through on phosphate mine inclined shaft

A 5.48m diameter CREC R277 hard rock TBM developed by China Railway Engineering Equipment Group Co., Ltd. (CREG) has completed…

06/12/2022

HS2 smashes Diesel-free sites target

HS2 smashes Diesel-free sites target

On its journey towards fully diesel-free construction sites by 2029, the UK’s HS2 project has announced that 10 sites are…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more