tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2022
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Breakthrough on the Galerie des Janots Tunnel

Breakthrough on the Galerie des Janots Tunnel

Tris Thomas

Written by Tris Thomas on 02/05/2019 in News

Tagged:

In April 2019, contractor Eiffage Civil Construction, using a Robbins 3.5m diameter Main Beam TBM, broke through on its 2.8km long drive on the Galerie des Janots Tunnel, in Cassis, France.

It was not the first time the machine encountered open space: twice during tunnelling, the machine hit uncharted caverns, the largest of which measured a staggering 8,000 cubic meters in size.

Image 3

The obstacles overcome at the recent breakthrough are a significant achievement, said Marc Dhiersat, Project Director of the Galerie des Janots tunnel for Eiffage Civil Construction. “We are proud to have led a motivated and conscientious team to the end of the tunnel who worked well without accidents despite the many technical difficulties encountered.”

The water tunnel passes through an area of limestone known for its groundwater, karstic cavities, and voids. The limestone, combined with powdery clays, made for difficult excavation after the machine’s March 2017 launch.  At the 1,035m mark, the crew hit a cavern on the TBM’s left side. The cavern, studded with stalactites and stalagmites, was grazed by the TBM shield. The crew had to erect a 4m high wall of concrete so the TBM would have something to grip against. The TBM was then started up and was able to successfully navigate out of the cavern in eight strokes without significant downtime to the operation—the process took about two weeks. Despite the challenges, Dhiersat thought positively of the TBM throughout the ordeal: “This has been the best machine for the job due to all the geological difficulties.”

The first cavern, while the largest, was not the most difficult void encountered. The machine was averaging 20 to 22m advance per day in two shifts after clearing the first cavity, with a dedicated night shift for maintenance. While excavating, a combination of probe drilling and geotechnical BEAM investigation—a type of electricity-induced polarization to detect anomalies ahead of the TBM—were used. Crews ran the excavation five days per week, achieving over 400m in one month. This performance continued until the 2,157m mark, when the machine grazed the top of an unknown cavity that extended deep below the tunnel path. The structure measured 22m long, 15m wide, and 14m deep, or about 4,500 cubic meters of open space.

Crews probed in front of the cutterhead and began work to stabilize and secure the cavity with foam and concrete, as well as excavate a bypass gallery. “After filling much of the cavity (1,500m3), our biggest difficulty was to ensure the gripping of the machine: We needed six bypass galleries and four months of work to reach the end of this challenge,” said Dhiersat.  For the last 600m of tunnelling, “we were finally in good rock,” he emphasized. Overall rates for the project averaged 18m per day in two shifts, and topped out at 25m in one day.

“The cooperation with Marc and his team on site was very good and we always enjoyed their professionalism and commitment to the project and the task. This, without any doubt was key for the success we achieved,” said Detlef Jordan, Business Manager Robbins Europe. “For us, it was satisfying and motivating to see that, by working together and joining the efforts of all partners on the project, the best and most successful outcome can be achieved. This commitment for decades has been at the heart of success in the tunneling industry, but it has not always been observed on other recent projects.”

Galerie des Janots is one of fourteen operations designed to save water and protect resources, which are being carried out by the Aix-Marseille-Provence metropolis, the water agency Rhône Mediterranean Corsica, and the State Government. The Janots gallery, once online, will replace existing pipelines currently located in a railway tunnel—these original pipes have significant deficiencies with estimated water losses of 500,000 cubic meters per year. The new tunnel will increase capacity to 440 liters per second.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  1. Jeff Murphy says:
    21/06/2019 at 4:37 pm

    I’m curious to what type/name of equipment was used for detection ahead of machine and how it worked. The article references “a type of electricity-induced polarization to detect anomalies ahead of the TBM”. I am looking for this type of equipment/monitoring for my job currently under design. Any help would be greatly appreciated.

    Reply

Search

Digital Edition

More Like This

19/10/2022

hyperTunnel reveals robot built tunnel

hyperTunnel reveals robot built tunnel

New tunnelling tech company hyperTunnel has been making mainstream headlines today with the announcement that it has constructed the first-ever…

04/11/2022

LHDA awards Polihali Transfer Tunnel and Dam contracts

LHDA awards Polihali Transfer Tunnel and Dam contracts

The Lesotho Highlands Development Authority (LHDA) has announced the Polihali Transfer Tunnel and Polihali Dam construction contract awards, the two…

31/10/2022

Fifth TBM launched on HS2

Fifth TBM launched on HS2

HS2 Ltd has launched the fifth TBM, ‘Caroline’, that will be constructing tunnels for the HS2 railway through London. The…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more