tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Canadian Tunnelling
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2024
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > CREG Retractable pipe jacking machine passes FAT

CREG Retractable pipe jacking machine passes FAT

Written by Tris Thomas on 23/05/2025 in News

Tagged: CREG

On May 19th, 2025, the retractable circular full-face pipe jacking machine “CREC1563”, developed and manufactured by China Railway Engineering Equipment Group Co., Ltd. (CREG), successfully completed its Factory Acceptance Test. The machine will be utilized to bore the Kwu Tung and Cheung Sha Wan Sewage Pipeline Projects in Hong Kong.

Picture 1The pipe jacking machine features an innovative foldable and retractable cutter head design, enhancing its ability to handle complex conditions and significantly improving ease of use and safety.

The project involves challenging geological conditions, including gravel, a narrow launch shaft space (3.1m in length and width), and the high construction risks associated with passing under a subsea area. To address these challenges, the machine has been designed with a compact excavation diameter of 3.04m and front and tail shield lengths of less than 3.1m, allowing it to be lifted into the narrow launch shaft space.

For high-risk subsea construction, there is the potential risk of abnormal cutter damage and excavation challenges when encountering gravel layers. To mitigate these risks, the machine incorporates an innovative retractable design, featuring a dual-shell shield structure and a foldable cutterhead. When facing subsea construction, the retractable pipe jacking machine can achieve breakthrough by retracting the cutterhead and withdraw it along with the inner shell.

CREG

CREG (China Railway Engineering Equipment Group Co., Ltd.) is a worldwide underground solutions provider for a full range of mechanized...

More Information | info@crectbm.com | +86 371 6060 8680

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

08/05/2025

Hunter Street Station excavation complete

Hunter Street Station excavation complete

A major milestone has been reached in the delivery of the Sydney Metro West project, with excavation of the Hunter…

28/01/2025

Parallel Thimble Shoal Tunnel Project achieves breakthrough

Parallel Thimble Shoal Tunnel Project achieves breakthrough

The Parallel Thimble Shoal Tunnel Project at the Chesapeake Bay Bridge-Tunnel in the U.S. state of Virginia reached a significant milestone…

29/05/2025

Thames Water issues tender notice for tunnelling works

Thames Water issues tender notice for tunnelling works

The UK’s Thames Water is seeking tunnelling specialists as it works to progress its Teddington Direct River Abstraction project. Following extensive…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social

Facebook Linkedin X-twitter Instagram
Youtube Soundcloud Linkedin Rounded Border Svgrepo Com White

Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok