tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Canadian Tunnelling
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2024
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Ellie breaks through into Stepney Green

Ellie breaks through into Stepney Green

Written by Tris Thomas on 17/06/2014 in News

Tagged:

Crossrail TBM ‘Ellie’ has broken through into a cavern 40m beneath Stepney Green, in the East End of London. The breakthrough marks the structural completion of tunnels for Crossrail’s north east spur, between Whitechapel and Pudding Mill Lane.

It has taken Ellie just over three months to complete the 2.7km journey, travelling as much as 72m in a 24 hour period.

In the coming weeks Ellie will be lifted out of the cavern and taken by road to Limmo Peninsula at Canning Town. From there she will be re-assembled ahead of recommencing tunnelling towards Victoria Dock Portal.

Andrew Wolstenholme, Crossrail Chief Executive said: “Ellie has made a safe journey from the shadow of the Olympic stadium to our site at Stepney Green. Our tunnel teams deserve congratulations for an impressive feat of engineering. Construction of the new rail tunnels for Europe’s largest infrastructure project is now over 80 per cent complete. Crossrail continues to be delivered on time and on budget.”

When Crossrail opens in 2018, it will increase London’s rail-based transport network capacity by 10 per cent and cut journey times across the city, bringing an extra 1.5m people to within 45 minutes of central London.

Joint Venture Dragados Sisk is constructing the eastern tunnels between Pudding Mill Lane and Stepney Green, Limmo Peninsula and Farringdon, and Victoria Dock Portal and Limmo.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

21/12/2024

Five bids revealed for Poland’s longest rail tunnel

Five bids revealed for Poland’s longest rail tunnel

A total of five bids have been submitted for the construction of the long-distance tunnel on railway line no. 85…

08/04/2025

Final tunnels on Eglinton Crosstown West Extension begin construction

Final tunnels on Eglinton Crosstown West Extension begin construction

Canada’s Ontario government has broken ground on the final tunnel section of the $4.7bn Eglinton Crosstown West Extension, marking another…

04/06/2025

HS2’s Mary Ann removed from Bromford Tunnel portal

HS2’s Mary Ann removed from Bromford Tunnel portal

After completing the 5.6km first bored tunnel of the UK’s HS2 Bromford Tunnel, linking North Warwickshire and Birmingham, HS2’s Herrenknecht…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social

Facebook Linkedin X-twitter Instagram
Youtube Soundcloud Linkedin Rounded Border Svgrepo Com White

Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok