tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2023
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > LA’s Purple Line Section 3 award

LA’s Purple Line Section 3 award

Tris Thomas

Written by Tris Thomas on 21/06/2018 in News

Tagged: Frontier-Kemper/Tutor Perini,LA's Purple Line Section 3

The Frontier-Kemper/Tutor Perini Joint Venture has received a notice of intent to award a contract from the Los Angeles County Metropolitan Transportation Authority for the Purple Line Extension Section 3 Tunnels Project. The contract value is anticipated to be approximately $410M. The project involves the design and construction of twin bored tunnels for future Purple Line subway service spanning approximately 2.6 miles (4.1km) between Century City and the VA Hospital in Westwood. The subway extension will provide a high-capacity, high-speed, dependable transit alternative for those traveling to and from Los Angeles’ Westside.

Tutor Perini is currently working on the Purple Line Extension Section 2 Project, which includes tunnelling and construction of new stations in Beverly Hills and Century City.

Contract award for the Purple Line Section 3 Tunnels Project is expected in the next 30 to 60 days, with notice to proceed anticipated soon thereafter. Substantial completion is anticipated in the summer of 2022.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

25/10/2023

CRCHI’s first EPBM export to South America

CRCHI’s first EPBM export to South America

On September 27th, China’s first EPBM to be exported to South America, manufactured by CRCHI, left the production line. With…

13/11/2023

HS2 digital concrete test to cut carbon

HS2 digital concrete test to cut carbon

A successful trial of a ground-breaking digital measuring system for concrete has led to a roll-out across multiple sites on…

24/08/2023

Master Builders Solutions announce Concrete Now! digital tool

Master Builders Solutions announce Concrete Now! digital tool

Master Builders Solutions has announced the launch of the Concrete Now! app. The web and mobile app provides concrete professionals…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more