tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2022
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Keller wins US$50M Crossrail work

Keller wins US$50M Crossrail work

Tris Thomas

Written by Tris Thomas on 18/08/2011 in News

Tagged: underground

Keller Group plc has announced that it has been awarded two major contracts totalling US$50M relating to the main tunnels for London’s Crossrail,.Keller UK (“Keller”) has won the compensation grouting works at LU’s Tottenham Court Road and Bond Street stations. The contract covers the installation of over 50km of specialist grout pipe. Keller has also been awarded a contract for structural monitoring, geotechnical instrumentation and surveying works, employing the Getec monitoring system.

The two contracts will be undertaken in joint venture and work on both will begin shortly and will run through to 2014.

These follow the award of a US$61M contract to Keller in June for grouting works for London’s Victoria Underground Station upgrade, which will start in late 2011 and will be undertaken with support from other Group businesses in Europe.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

22/11/2022

CREG TBM breaks through on phosphate mine inclined shaft

CREG TBM breaks through on phosphate mine inclined shaft

A 5.48m diameter CREC R277 hard rock TBM developed by China Railway Engineering Equipment Group Co., Ltd. (CREG) has completed…

17/02/2023

CRL Project Update – flooding and cyclone impacts

CRL Project Update – flooding and cyclone impacts

The City Rail Link has reported that Cyclone Gabrielle and the earlier Auckland Anniversary flooding event have left minimal lasting…

01/03/2023

Snowy Hydro updates on sinkhole delayed TBM

Snowy Hydro updates on sinkhole delayed TBM

The Snowy 2.0 project client ‘Snowy Hydro’ has given an update as to the current status of TBM Florence, recently…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more