London cable tunnel breakthrough 3
London cable tunnel breakthrough 3
Written by
tom watts on
28/11/2012 in
Tagged:
More Like This
HS2’s next Northolt Tunnel TBMs head underground
Major components of the first of the second pair of Herrenknecht EPBMs that will bore HS2’s 13.4km long Northolt High…
PERI SE acquires KERN Tunneltechnik SA
PERI SE has acquired a majority stake in KERN Tunneltechnik SA, based in Lugano (Switzerland). The KERN Group currently has…
COWI milestone on Ontario Line station design
COWI has reported reaching the half-way mark of the design of two new subway stations for Ontario Line at King/Bathurst…
Comments: