tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2023
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Motts designing Tideway East

Motts designing Tideway East

Tris Thomas

Written by Tris Thomas on 29/01/2016 in News

Tagged:

Mott MacDonald has confirmed it is designing the eastern section of the Thames Tideway Tunnel on behalf of a joint venture of Costain Ltd, VINCI Construction Grands Projets and Bachy Soletanche.

Tideway is delivering the biggest infrastructure project ever undertaken by the UK water industry, which will see 25km of tunnels constructed beneath London. It will make London’s sewerage network fit for the 22nd century and will help prevent millions of tonnes of sewage pollution that currently discharges into the tidal River Thames every year.

The East section package includes the construction of two tunnels – a 5.5km section of the main 25km tunnel and a 4.6km connecting tunnel for combined rainwater and wastewater – both of which will serve the east of London. Located between 45m and 65m below ground, the two tunnels will be excavated by tunnel boring machines (TBMs) using slurry pressure balance technology. The main tunnel will have an interior diameter of 7.2m, while the diameter of the connecting tunnel will be 5m. The East section also includes the construction of five large shafts using diaphragm walls to a depth of 72m and with diameters of between 17m and 25m, maritime works on the Thames, associated structures connecting with the existing wastewater collection system and electromechanical works packages.

Michael Francis, Mott MacDonald’s project director, said: “It is fantastic to be involved in the creation of one of London’s most significant infrastructure projects. The East works package is the deepest section of the project, with tunnels driven by slurry TBMs deep in the chalk up to 70m below the water table. The deep shafts will be constructed using diaphragm walls and the complex hydraulic structures to divert flows require soil mixing ground treatment, secant piles and high-quality concrete meeting the 120 year design life.”

An optimisation phase, which includes design and methods, is almost completed and the design team are delivering the first conceptual designs using state-of-the-art building information modelling models and processes. The works are scheduled for delivery in 2023.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

25/07/2023

Strabag HS2 tunnel segment production begins

Strabag HS2 tunnel segment production begins

The production of the concrete tunnel segments for HS2 has begun at a new facility at Hartlepool docks. STRABAG were…

18/08/2023

Systra completes Bamser and Subterra acquisitions

Systra completes Bamser and Subterra acquisitions

Systra has recently completed the acquisition of two companies dedicated to the design of tunnels and underground structures, Bamser, and Subterra. The acquisitions reinforce…

04/09/2023

Peggy breaks through on Sydney Metro – Western Sydney Airport project

Peggy breaks through on Sydney Metro – Western Sydney Airport project

TBM Peggy has broken through into the 25m deep Airport Terminal station box at the future Airport Terminal station in…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more