tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2021
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Sound Transit floats tunnel option for West Seattle link

Sound Transit floats tunnel option for West Seattle link

Amanda Foley

Written by Amanda Foley on 04/06/2019 in News

Tagged:

On May 23, the Sound Transit Board identified preferred alternatives and other alternatives to study in the Draft Environmental Impact Statement (DEIS) phase for the West Seattle and Ballard Link Extensions, with one option for the West Seattle to Downtown link including a tunnel that would cost an additional $1 billion.

West Seattle Ballard map

West Seattle Ballard map

The proposed tunnel would run under Salmon Bay and would not be covered by the $54 billion regional ST3 funding package that voters approved in November 2016. The tunnel would therefore require third-party money in order to fund it.

Past estimates have the tunnel costing $350 million more than plans to lay tracks over a draw bridge. The bridge would be required to open two to four times a day for marine traffic. Also making it into consideration is a high fixed bridge across Salmon Bay, which would cost around $100 million more than a draw bridge, but $250 million less than the tunnel. Supporters of the tunnel claim that it would be less disruptive to neighborhoods, and more aesthetically pleasing, ultimately making it worth the added cost.

The total West Seattle to Downtown expansion plan adds 4.7-miles of light rail between West Seattle and downtown Seattle, with five stations between the stadium area and the Alaska Junction.

The 7.1-mile Ballard to Downtown extension adds 7.1-miles of light rail service from downtown Seattle to Ballard, including a new downtown Seattle rail-only tunnel and nine stations between the Chinatown-International District and Ballard.

Sound Transit will vote on its final decision in 2022.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

17/08/2020

Auckland’s City Rail Link EPBM on its way

Auckland’s City Rail Link EPBM on its way

New Zealand’s largest transport infrastructure project is celebrating a significant milestone – Auckland’s City Rail Link (CRL) has formally accepted…

24/09/2020

Successful TBM launch on the Chouer to Liao River Diversion Project

Successful TBM launch on the Chouer to Liao River Diversion Project

September 10, 2020, saw the successful launch of the 5.2m diameter CREC667 TBM, named Peaceful Grassland, which will be used…

09/09/2020

IEM and ITA release WTC2020 streaming details

IEM and ITA release WTC2020 streaming details

Following the Covid-19 pandemic induced cancellation of the World Tunnel Congress 2020 (WTC2020), due to be held in Kuala Lumpur…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more