tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Canadian Tunnelling
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2024
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Terratec micro-system delivered to Thailand

Terratec micro-system delivered to Thailand

Written by Tris Thomas on 02/08/2013 in News

Tagged:

TBM supplier, TERRATEC has successfully completed the Factory Acceptance Tests of a new DN1500 Microtunnelling System. The ceremony was held in TERRATEC new facilities in Thailand, in the presence of the representatives from the Buyer, Nawarat Patanakarn PCL.

The MTBM is a Pipe Jacking System designed to handle standard Concrete Pipes of I.D. 1500mm, O.D. 1800mm and 2500mm in length to be used by the Contractor in different drainage projects of Bangkok Metropolitan Administration (BMA). The system is designed to excavate tunnel drives up to 350m in length with the assistance of one or two Intermediate Jacking Stations. TERRATEC scope of supply from include the Shield, the Main Jacking Station, Intermediate Jacking Stations, the Slurry Transport System, a digital Guidance System and a Control Room on the surface with the Operation Panel and Power Pack.

The system was designed by TERRATEC on its Engineering Centre in Hobart, Australia, and the production and assembly was done in TERRATEC’s new plant in Thailand, with key components coming mainly from Australia and Japan. In the last two years, the Company has sold fourteen (14) microtunelling systems with diameter ranging from 300mm to 1800mm in South East Asia Region, reason why the TERRATEC’s management decided to set-up the production and maintenance centre of its Microtunnelling Division in Thailand.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

17/04/2025

TBM launched on Haitai Yangtze River Tunnel

TBM launched on Haitai Yangtze River Tunnel

On April 9th, 16.64m diameter TBM “Jianghai”, designed and developed by China Railway Construction Heavy Industry Corporation Limited (CRCHI), was…

17/01/2025

CREG Double Shield TBM Completes FAT

CREG Double Shield TBM Completes FAT

On Jan 15th, 2025, small-diameter double shield TBM “CREC 1477” completed its FAT in Zhengzhou city, Henan province, China. With…

28/01/2025

Gamuda-Ferrovial JV signs ECI deal for Capricornia hydro system

Gamuda-Ferrovial JV signs ECI deal for Capricornia hydro system

Gamuda, in a joint venture with Ferrovial (GFJV), has signed an Early Contractor Involvement (ECI) agreement with Capricornia Energy Hub…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social

Facebook Linkedin X-twitter Instagram
Youtube Soundcloud Linkedin Rounded Border Svgrepo Com White

Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok