tott 2
tott 2
Written by
Amanda Foley on
05/11/2010 in
Tagged:
More Like This
CREG Slurry TBM Ready for Chongtai Yangtze River Tunnel
January 27th 2024 saw the 15.4m diameter Slurry TBM “CREC 1398”, designed and manufactured by China Railway Engineering Equipment Group…
HS2 Chiltern tunnel cross passages reach halfway
The construction of HS2’s longest tunnels – stretching for 16km under the Chilterns – passed a key milestone this week…
CREG announces TBM Online Monitoring and Diagnosis System (TOMD)
China Railway Engineering Equipment Group Co., Ltd. (CREG) has announced the research and development of the TBM Component Conditions Online…
Comments: