tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Canadian Tunnelling
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2024
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > United Utilities shortlist three applicants for HARP ITA role

United Utilities shortlist three applicants for HARP ITA role

Written by Tris Thomas on 07/08/2024 in News

Tagged: HARP,Haweswater Aqueduct Resilience Programme

United Utilities has taken another major step for the Haweswater Aqueduct Resilience Programme (HARP) by shortlisting three applicants for the role of Independent Technical Adviser (ITA) to participate in the next stage of the tender process.

The following applicants (listed alphabetically) have been invited to negotiate with United Utilities:

  • FR JV and Partners comprising of Fluor Limited and Ramboll UK Limited
  • Jacobs
  • Turner & Townsend Infrastructure Limited

Screenshot 2024 08 09 at 11.38.22HARP will be the largest infrastructure project undertaken by United Utilities since privatisation. The original aqueduct was completed in the 1950s to increase supplies of water into Manchester and the Pennines from the Lake District. The project will ensure the resilience of the asset for decades to come.

The water company for the North West is seeking to appoint a Competitively Appointed Provider (CAP) to design, build, finance and maintain the replacement of the six tunnels sections – approximately 50km – of the Haweswater Aqueduct.

The ITA will have a crucial role in ensuring that management of the CAP is assured and/or verified by independent parties. The next stage of the tender process will identify the Preferred Bidder that will then be appointed as the ITA.

Neil Gillespie, Transformation and Strategic Programmes Director at United Utilities, said: “The ITA role is key for HARP as the successful applicant will provide objective, independent oversight of the CAP’s management of project costs and delivery.

“We’re pleased to have received strong applications for this role and look forward to receiving proposals from the applicants shortlisted for the next stage in due course.”

The HARP project will see six tunnel sections of the existing Haweswater Aqueduct replaced and new connections to existing multiline siphons between the tunnel sections and associated facilities installed.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

05/06/2025

Melbourne North-East Link TBMs re-launched

Melbourne North-East Link TBMs re-launched

The two 15.6m diameter Herrenknecht TBMs building Victoria’s longest road tunnels are back in action, relaunching from Lower Plenty Road…

17/01/2025

CREG Double Shield TBM Completes FAT

CREG Double Shield TBM Completes FAT

On Jan 15th, 2025, small-diameter double shield TBM “CREC 1477” completed its FAT in Zhengzhou city, Henan province, China. With…

21/12/2024

Five bids revealed for Poland’s longest rail tunnel

Five bids revealed for Poland’s longest rail tunnel

A total of five bids have been submitted for the construction of the long-distance tunnel on railway line no. 85…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social

Facebook Linkedin X-twitter Instagram
Youtube Soundcloud Linkedin Rounded Border Svgrepo Com White

Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok