Belchen
Belchen
Written by
tom watts on
17/07/2017 in
Tagged:
More Like This
Sydney Metro achieves TBM double breakthrough
Two 7m diameter TBMs working on the Sydney Metro have broken through a rock wall to arrive at Five Dock…
HS2’s ‘Florence’ and ‘Cecilia’ reach Chesham Road
HS2 has confirmed that ‘Florence’ and ‘Cecilia’ – the two TBMs digging the project’s longest tunnels – have reached the…
Sydney Metro West TBMs reach Burwood North
Two 7m diameter double-shield, hard rock, gripper-type Herrenknecht TBMs driven by the Acciona Ferrovial Joint Venture have arrived at Burwood…
Comments: