NWRL Map 171012 1 1
NWRL Map 171012 1 1
Written by
tom watts on
19/09/2013 in
Tagged:
More Like This
HS2 final TBM breaks through on Chiltern Tunnels
The second 10.25m diameter Herrenknecht TBM building HS2 under the Chiltern Hills has broken through at the tunnel’s northern portal,…
Rapid progress reported on Vishnugad-Pipalkoti Hydropower Project
TERRATEC has announced that the Ø9.86m Hard Rock Double Shield TBM being driven by Hindustan Construction Co. Ltd – primary…
DC Water awards Potomac River Tunnel contract
DC Water has awarded CBNA, Halmar, COWI, and Hatch the design-build contract for the construction of the Potomac River Tunnel…
Comments: