ROBBINS TBM
ROBBINS TBM
Written by
tom watts on
28/04/2017 in
Tagged:
More Like This
First of two 10.37m TBMs presented to Brenner JV
Herrenknecht has presented the PORR and MARTI consortium with the first of two Double Shield TBMs that will bore construction…
Sydney Metro West TBMs reach Burwood North
Two 7m diameter double-shield, hard rock, gripper-type Herrenknecht TBMs driven by the Acciona Ferrovial Joint Venture have arrived at Burwood…
HS2 final TBM breaks through on Chiltern Tunnels
The second 10.25m diameter Herrenknecht TBM building HS2 under the Chiltern Hills has broken through at the tunnel’s northern portal,…
Comments: