NWRL Map 171012 1 1
NWRL Map 171012 1 1
Written by
tom watts on
25/06/2014 in
Tagged:
More Like This
Mont Cenis Herrenknecht TBM delivered to ELYOT JV
The fifth of the seven TBMs to be used for excavation of the Lyon-Turin Rail Tunnel has been delivered to…
Stantec to acquire ZETCON Engineering
Design and Engineering specialist, Stantec, has signed an agreement to acquire ZETCON Engineering, a 645-person engineering firm headquartered in Bochum,…
Sydney Metro achieves TBM double breakthrough
Two 7m diameter TBMs working on the Sydney Metro have broken through a rock wall to arrive at Five Dock…
Comments: