Pic 2. 3D of Brenner
Pic 2. 3D of Brenner
Written by
tom watts on
08/04/2014 in
Tagged:
More Like This
CREG Slurry TBM Ready for Chongtai Yangtze River Tunnel
January 27th 2024 saw the 15.4m diameter Slurry TBM “CREC 1398”, designed and manufactured by China Railway Engineering Equipment Group…
HS2 positions second Bromford Tunnel TBM
Assembly has been completed of HS2’s Herrenknecht TBM that will start digging the second bore of the 5.6km Bromford Tunnel…
ITA Tunnelling Awards 2023 winners announced
The winners of the 9TH Edition of the ITA TUNNELLING AWARDS were announced in Mumbai, India on 24th November in conjunction with…
Comments: