3b Island view Night
3b Island view Night
Written by
tom watts on
13/04/2016 in
Tagged:
More Like This
HS2 final TBM breaks through on Chiltern Tunnels
The second 10.25m diameter Herrenknecht TBM building HS2 under the Chiltern Hills has broken through at the tunnel’s northern portal,…
Sydney Metro West TBMs reach Burwood North
Two 7m diameter double-shield, hard rock, gripper-type Herrenknecht TBMs driven by the Acciona Ferrovial Joint Venture have arrived at Burwood…
HS2’s ‘Florence’ and ‘Cecilia’ reach Chesham Road
HS2 has confirmed that ‘Florence’ and ‘Cecilia’ – the two TBMs digging the project’s longest tunnels – have reached the…
Comments: