Lucknow Metro
Lucknow Metro
Written by
tom watts on
27/09/2017 in
Tagged:
More Like This
HS2 final TBM breaks through on Chiltern Tunnels
The second 10.25m diameter Herrenknecht TBM building HS2 under the Chiltern Hills has broken through at the tunnel’s northern portal,…
First of two 10.37m TBMs presented to Brenner JV
Herrenknecht has presented the PORR and MARTI consortium with the first of two Double Shield TBMs that will bore construction…
TWRP Pipeline-C1 Tunnel breaks through in Singapore
November 22nd saw Shanghai Tunnel Engineering Co (Singapore) breakthrough successfully on the S$116M contract price TWRP Pipeline-C1 Tunnel in Singapore….
Comments: