cutterhead of tbm ellie breaking through into the pre cast concrete 35 metres below ground at stepney green 145062
cutterhead of tbm ellie breaking through into the pre cast concrete 35 metres below ground at stepney green 145062
Written by
tom watts on
17/06/2014 in
Tagged:
More Like This
ITA Tunnelling Awards 2023 winners announced
The winners of the 9TH Edition of the ITA TUNNELLING AWARDS were announced in Mumbai, India on 24th November in conjunction with…
TBMs prepare for re-launch on Sydney Metro West
Work is ramping up at the Sydney Metro West site at The Bays with preparations in full swing to construct…
COWI selected as technical advisor to Stad Ship Tunnel
The Norwegian Coastal Administration has selected COWI as technical advisor for the construction of the 2.2km long (including entrance areas),…
Comments: