TBM Peggy has broken through into the 25m deep Airport Terminal station box at the future Airport Terminal station in…
Tag: Herrenknecht
Final Sydney Metro – Western Sydney Airport TBM named and launched
The fourth and final Herrenknecht TBM to be used to bore the $1.8bn Sydney Metro – Western Sydney Airport project…
Boring completed on London’s Silvertown Tunnel
Jill, the 11.9m diameter Herrenknecht TBM delivering the Silvertown Tunnel in east London, has now completed work on the second…
HS2’s Florence and Cecilia reach Little Missenden shaft
HS2 has confirmed that ‘Florence’ and ‘Cecilia’ – the two 10.26m diameter Herrenknecht TBMs boring HS2’s longest tunnels – have…
Sydney Metro – Western Sydney Airport project EPBM launched
A third TBM has been launched for the $1.8bn Sydney Metro – Western Sydney Airport project at Orchard Hills in…
City Rail Link completes Maungawhau Station tunnels
Auckland’s City Rail Link project has chalked up another milestones with the completion of mined tunnelling at Maungawhau Station in…
Boring begins on Sydney Metro West Central Package
The first of two Herrenknecht double-shield, hard rock, gripper-type TBMs has started boring on the Central Tunnel Package of the…
Broadway’s second TBM breaks through
Phyllis, the second of two 6m diameter Herrenknecht TBMs that are excavating twin tunnels for Vancouver’s $1.728bn Broadway Subway Project,…
Snowy 2.0 TBM Kirsten breaks through on ECVT
New South Wales’ Snowy 2.0 pumped-hydro mega project has achieved another important construction milestone, with a second tunnel excavation completed…
HS2 launches third TBM in London
HS2 has once again begun tunnelling under London, launching its third TBM under the city. The 853m long, 6.2m i.d….