PR BBMV reaches major construction milestone 2
PR BBMV reaches major construction milestone 2
Written by
tom watts on
03/12/2014 in
Tagged:
More Like This
Strabag/Porr JV presented with Vienna Subway EPBM
Arge U2, a JV comprising Strabag/Porr has been presented with the 6.84m diameter Herrenknecht EPBM it will use to bore…
Shenzhen WTC2024 registration in full swing
The annual World Tunnel Congress 2024 (WTC2024) will be held from April 19-25th, 2024 in the Shenzhen World Exhibition &…
Sydney Metro West TBMs reach Burwood North
Two 7m diameter double-shield, hard rock, gripper-type Herrenknecht TBMs driven by the Acciona Ferrovial Joint Venture have arrived at Burwood…
Comments: