Terratec BT
Terratec BT
Written by
tom watts on
12/08/2014 in
Tagged:
More Like This
HS2 launches third Northolt Tunnel TBM
HS2’s London tunnels programme has passed another major milestone following the launch of the section’s third TBM. Herrenknecht 9.11m diameter…
CREG announces TBM Online Monitoring and Diagnosis System (TOMD)
China Railway Engineering Equipment Group Co., Ltd. (CREG) has announced the research and development of the TBM Component Conditions Online…
HS2 final TBM breaks through on Chiltern Tunnels
The second 10.25m diameter Herrenknecht TBM building HS2 under the Chiltern Hills has broken through at the tunnel’s northern portal,…
Comments: