S48 170202 WP 45
S48 170202 WP 45
Written by
tom watts on
06/11/2017 in
Tagged:
More Like This
Abstract deadline for 9th International Symposium on Sprayed Concrete
The deadline for submission of abstracts for the 9th International Symposium on Sprayed Concrete – to be held at Scandic…
Strabag/Porr JV presented with Vienna Subway EPBM
Arge U2, a JV comprising Strabag/Porr has been presented with the 6.84m diameter Herrenknecht EPBM it will use to bore…
HS2’s ‘Florence’ and ‘Cecilia’ reach Chesham Road
HS2 has confirmed that ‘Florence’ and ‘Cecilia’ – the two TBMs digging the project’s longest tunnels – have reached the…
Comments: