Bertha Side piece lift and place 1
Bertha Side piece lift and place 1
Written by
tom watts on
24/03/2015 in
Tagged:
More Like This
Bouygues Travaux Publics – Murphy JV wins LTC Tunnels and Approached contract
National Highways has today announced that it has awarded Bouygues Travaux Publics – Murphy Joint Venture the Lower Thames Crossing Tunnels and…
CREG Slurry TBM Ready for Chongtai Yangtze River Tunnel
January 27th 2024 saw the 15.4m diameter Slurry TBM “CREC 1398”, designed and manufactured by China Railway Engineering Equipment Group…
Silkyara collapse update – Initial auger fails as more powerful machine deployed
Forty tunnel workers who have been trapped some 200m from the portal since a collapse occurred at 5am on Sunday…
Comments: