tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2022
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Arup appointed for 100km Collider tunnel

Arup appointed for 100km Collider tunnel

Tris Thomas

Written by Tris Thomas on 12/09/2014 in News

Tagged:

Arup has been appointed by CERN to undertake conceptual design studies for both the 100km long tunnel engineering and geotechnical considerations for the Future Circular Collider (FCC) study.

To provide an efficient and cost effective decision aid for the feasibility assessments of the particle accelerator infrastructure, Arup has been working closely with CERN and project partners Géotechnique Appliquée Dériaz S.A. (GADZ) and Amberg Engineering AG, to deliver the first phase of the conceptual design study.

A key element of this stage has been the development of an early stage Building Information Modelling (BIM) tool to inform performance, risk and cost optimized options for a 100km long, circular particle-accelerator tunnel. Arup has developed a dynamic Web-based GIS application, which integrates numerous existing geological data sources, incorporating the geological, tunnelling and particle collider system constraints in a user-friendly digital environment.

“Using BIM this early on in the design process is invaluable.  It allows us to make critical decisions using data that can be easily visualised, enabling the team to make decisions with a clear overview of the multiple, highly complex components of this ground breaking project.  We’re delighted to be working with such a far-sighted client and strong project team to help CERN achieve its objective to break new boundaries in particle physics research.” Said Matt Sykes, Project Director, Arup

“Several layouts for this new machine are under consideration, with the tunnel circumference ranging from 80 to 100km. This tool being developed by Arup, will be crucial in the decision making process, to help decide which layout is most feasible” explained John Osborne, Civil Engineer, CERN

The new accelerator tunnel would be nearly four times the size of the present Large Hadron Collider (LHC). The studied infrastructure would be able to host frontier particle colliders delivering unprecedented intensities and energies to the worldwide particle physics research community throughout the twenty-first century.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

22/11/2022

Robbins Double Shield Launches in Nepal

Robbins Double Shield Launches in Nepal

In October 2022, China Overseas Engineering Group Co. Ltd and China Railway No. 2 Engineering Group Co Ltd launched a…

30/09/2022

EPBMs launched on Corridor-1 of Kanpur MRTS Project

EPBMs launched on Corridor-1 of Kanpur MRTS Project

Terratec celebrated the successful site acceptance testing of two 6.52m diameter EPBMs for Uttar Pradesh Metro Rail Corporation (UPMRC) for…

24/08/2022

New speakers announced for BTS Conference and Exhibition 2022

New speakers announced for BTS Conference and Exhibition 2022

New speaker additions to the BTS Conference and Exhibition 2022 can now be announced with the confirmation of a host…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more