tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Canadian Tunnelling
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2024
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > RFQ issued for George Massey Tunnel replacement

RFQ issued for George Massey Tunnel replacement

Written by Tris Thomas on 17/06/2023 in News

Tagged: George Massey Crossing Project,George Massey Tunnel

A request for qualifications (RFQ) has been issued to replace the aging George Massey Tunnel on Highway 99 in the Metro Vancouver region of southwestern British Columbia, with a new eight-lane, toll-free immersed tube tunnel.

proxy 1

“This is a major milestone in the project to replace the George Massey Tunnel,” said Rob Fleming, Minister of Transportation and Infrastructure. “We are making significant progress on this important project that will improve travel times and transit options for people who live on both sides of the Fraser River.”

Following the RFQ, the Province will issue a request for proposals (RFP) from a shortlist of qualified teams to select a single proponent to move forward in the procurement process. Concurrently, the project is progressing through the Province’s environmental assessment process. Corridor improvements and construction of a new five-lane Steveston Interchange are already underway.

The new crossing will be an eight-lane immersed tube tunnel with three general-purpose travel lanes and one dedicated transit lane in each direction. The new tunnel will have bike and pedestrian crossings to support active transportation options in the region. The project also includes replacing the existing Deas Slough Bridge as well as the addition of a southbound general-purpose lane on Highway 99 between Westminster Highway in Richmond and Highway 17 in Delta.

With the new tunnel and approaches in place, travel will flow smoothly at 80km per hour, unlike the current average of 30km per hour.

The project will be constructed under a project labour agreement, similar to the Steveston Interchange. The project labour agreement will support local jobs, apprentices and training opportunities, as well as maximize participation of groups under-represented in the construction sector.

A new connection for transit buses between Bridgeport Road and Highway 99 southbound has opened, saving transit users minutes on their southbound trips. New bus-on-shoulder lanes south of the tunnel are in construction, which will improve travel times and add to the reliability of transit along the corridor.

The estimated cost of the George Massey Crossing immersed tube tunnel is approximately $4.15bn.

Comments:

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Digital Edition

More Like This

10/06/2025

Changi Airport Group awards T5 tunnels contract

Changi Airport Group awards T5 tunnels contract

Singapore’s Changi Airport Group (CAG) has awarded a contract for the construction of intra-terminal tunnels at Terminal 5 (T5) to…

09/03/2025

UK’s National Grid cable tunnel gains full approval

UK’s National Grid cable tunnel gains full approval

The UK’s power provider, National Grid has received full planning approval for the Grain to Tilbury project from Thurrock Council…

28/02/2025

Snowy 2 ‘serious safety incident’ prompts immediate review

Snowy 2 ‘serious safety incident’ prompts immediate review

Following a serious safety incident at New South Wales mega Hydro-project, Snowy 2.0, Client Snowy Hydro has released a statement…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social

Facebook Linkedin X-twitter Instagram
Youtube Soundcloud Linkedin Rounded Border Svgrepo Com White

Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok