tunnelling-journal (1)
tunnelling-journal (1)
  • Home
  • Print
    • Subscribe
    • Tunnelling Journal
    • Breakthrough
    • ITA Activity Report
    • A&NZ Journal
    • WTC Preview
    • Media Kit
  • Digital
    • Newsletter
    • E-Shots
    • TJ Digital edition
    • Products Page
    • Media Kit
  • Conferences
    • BTS Conference and Exhibition
    • Cutting Edge 2022
  • Buyer’s Guide
  • Events Diary
  • Jobs
  • About Us
  • Contact Us
  • Podcast

Home > Arup wins design of 6km Queensland Curtis LNG (QCLNG) Project tunnel

Arup wins design of 6km Queensland Curtis LNG (QCLNG) Project tunnel

Amanda Foley

Written by Amanda Foley on 07/12/2011 in News

Tagged:

Arup has won a tender to conduct the design of a 6km liquefied natural gas (LNG) tunnel for Arrow Energy on Queensland’s central coast, in Australia. The 6km-long 4m i.d. tunnel will be excavated at about 35m beneath the Gladstone Harbour seabed and ultimately house a high-pressure gas pipeline, which will transport coal seam gas (CSG) across the Narrows from the mainland to the Arrow LNG Plant on the southern end of Curtis Island.

The project will be one of the longest offshore tunnels in Queensland and is expected to take approximately three and a half years to construct. Arrow Energy chief Andrew Faulkner said design work would begin immediately, with the tunnel’s design and specification being conducted by Arup’s Brisbane office. “The tunnel will have a smaller footprint than if we were to construct a pipeline on the sea floor,” Faulkner said. “There will be entrance and exit points but no overwater construction.”

Queensland Environment Minister Tony Burke effectively gave the green light to the project early last month, when he approved two Queensland CSG projects – that involve drilling thousands of new coal-seam wells in Queensland’s Surat and Bowen basins – together worth a total of $30bn, which will be connected to Curtis Island for conversion to LNG via a 540km buried gas pipeline network linking the gas fields to the tunnel entrance at Gladstone.

The proposed LNG plant will occupy less than 1% of Curtis Island and will be separated from public areas by an environmental protection zone. The CSG projects are expected to begin shipping gas in 2014 and could create up to 18,000 direct and indirect jobs. Supply contracts have already been signed with customers in China, Japan, Singapore and France.

QCLNG Project web site

Comments:

Leave a Reply to Coal Seam Gas Cancel reply

Your email address will not be published. Required fields are marked *

  1. Coal Seam Gas says:
    18/10/2012 at 11:51 am

    Again big news for Arup and for the people of Queensland(18,000 job opportunity).Hope that Arup will finish up things efficiently and provide one of the longest offshore tunnels to Queensland.  

    Reply

Search

Digital Edition

More Like This

10/06/2022

HS2 starts work on first pioneering ‘Green Tunnel’

HS2 starts work on first pioneering ‘Green Tunnel’

The UK’s HS2 has announced the start of construction at the site of its first innovative ‘green tunnel’, designed to…

29/04/2022

Live performance marks Tideway’s tunnel completion

Live performance marks Tideway’s tunnel completion

Tunnelling has completed on London’s 25km long, 7.2m diameter Thames Tideway Tunnel and to commemorate this engineering feat, a live…

19/01/2022

Sydney Western Harbour Tunnel contract award

Sydney Western Harbour Tunnel contract award

Construction of Sydney’s Western Harbour Tunnel will begin within months, after a $722M contract was awarded to deliver the first…

  • Contact Us
  • Media Kit
  • Magazine Archive

Newsletter

The latest from the Tunneling Journal direct to your inbox.

Social



Enquiries

TGS Media Ltd
The Old Library
Webster House
Dudley Road
Tunbridge Wells
TN1 1LE
United Kingdom

© Tunnelling Journal. All Rights Reserved. Privacy Policy / Terms & Conditions. Admin

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more