Pit Simulation
Pit Simulation
Written by
tom watts on
23/10/2014 in
Tagged:
More Like This
HS2 launches third Northolt Tunnel TBM
HS2’s London tunnels programme has passed another major milestone following the launch of the section’s third TBM. Herrenknecht 9.11m diameter…
First of two 10.37m TBMs presented to Brenner JV
Herrenknecht has presented the PORR and MARTI consortium with the first of two Double Shield TBMs that will bore construction…
Stantec to acquire ZETCON Engineering
Design and Engineering specialist, Stantec, has signed an agreement to acquire ZETCON Engineering, a 645-person engineering firm headquartered in Bochum,…
Comments: